| Pewsham Locks Double Bridge |
|
This project is will be a major project for 2009/2010 restoring the 3 locks at Pewsham the dry dock and saw pit and dredging and re-profiling the canal bed as far as Double bridge.
|
| Pewsham Locks Double Bridge |
|
This project is will be a major project for 2009/2010 restoring the 3 locks at Pewsham the dry dock and saw pit and dredging and re-profiling the canal bed as far as Double bridge.
|