West Vale Branch

The West Vale Branch section has the Wiltshire / Oxfordshire border as it's western limit (where the canal crossed the river Cole) and extends some 12 km to just east of the village of Uffington.

The branch has monthly informal open meetings on the first Wednesday of each month, starting at 8 pm, at the Prince of Wales pub in Shrivenham High Street, with a work-party on the following Saturday for urgent tasks.

We hold regular weekly work-parties most Wednesday mornings, meeting at The Park in Stainswick Lane at 10 am.

We welcome "corporate volunteer teams". Many local firms have visited us for a fun day away from the office/workplace volunteering on canal restoration. We have a variety of jobs always on offer depending upon the time of year and the physical abilities and numbers of visitors. Work can be arranged for small groups, two or three, up to about 50, for a couple of hours or for a full day. (Click here for further information and previous groups).
Contact our work-party organiser - This email address is being protected from spambots. You need JavaScript enabled to view it.

Or contact our chairman, Graham Banks, for further details of the Branch at This email address is being protected from spambots. You need JavaScript enabled to view it.

 

At Shrivenham Fete 2019

 

Our stand at the 2019 Shrivenham Fete

 

 

Our Projects

Over the past 20+ years, the branch has cleared and dredged four lengths of the canal around Shrivenham and opened up 1500m of towpath. Currently, these sections are not continuous being disected by pubilc highways.

 

 Going from west to east - 

   

Bourton Wharf to Steppingstone Lane Bridge (720m) -  The canal at Bourton wharf is culverted twice by Townsend Road as it curves to meet the A420
(the house on
the junction incorporates the old wharfingers cottage), Back in 1992, the canal channel was clearly visible for much of its length as it is in a cutting.
Like the adjacent length to Station Road, it was infilled with silt, undergrowth and overgrown, coppiced willows; the towpath was not discernible as the bank
had washed down and small trees and scrub had taken over. Clearance and dredging started January 1993 and was completed in June '94.
The towapth, which is on the north side, was cleared again in 2013 for the "Towpath Challenge" long distance walk.
Steppingstone Lane is a public bridleway from Shrivenahm to Bourton village, the original bridleway bridge over the canal was demolished by the County Council
in the 1950s to save maintenace costs. Although the arch bridge has now been rebuilt, in similar style to the original, the canal is blocked by bunds on both
sides until restoration of the canal wing-walls is complete.

At the present time, there is no public access along this section, but the bridge site may be visited via the bridleway from Station Road or Bourton.

 Looking east from Townsend Road (2013 during towpath clearing) From Steppingstone Bridge towards Townsend Road (2013)

 Steppingstone Lane Bridge to Station Road (310m) -  This section was cleared and dredged with the section above and holds water for most of the year
but is heavily reeded. For many years the path to Station Road was on the south side of the canal at the base of a steep bank and frequently flooded.
In 2014 the Branch decided to reinstate the original towpath that was on the north side of the canal, so the route was cleared and levelled.
The towpath crosses to the south side at Station Road Arch Bridge and crosses back to the north at Longcot Top Lock. This change of sides was to avoid
building an additional bridge over the Longcot Arm, which goes north from the canal about 3½ km east of the Station Road Bridge.

At Station Road, the original road bridge is still in use but although much clearance was done in 1991 and later, it is silted up beneath.
The bridge parapets have sufferred from vehicle impacts on many occasions until in 2017 the bridge was made single carridgeway operation,
with northbound vehicles having to give way to oncoming traffic.

At present the Trust does not have access to maintain this length of towpath but is open as part of the Shrivenham Circular Walk.

 From Steppingstone Lane Bridge looking east (2013)

From Station Road Bridge looking west (2013)

West side of Station Road Bridge

  Station Road Bridge after a vehicle impact

 Station Road to Stainswick Lane (630m) - This length was the first major project to be carried out by the newly-formed West Vale Branch in 1991.
Work started in the September at Station Road Bridge, with the assistance of WRG and other volunteer groups, the towpath was cleared. Although visible,
dredging the canal channel was problematic as over 20 very large willow tree stumps had be removed and on part of the length the sub-soil is greensand.
It took from 1992 until the summer of 1996 to complete the dredging to Stainswick Lane.
The electricity sub-station adjacent to Station Road had encroached on the canal embankment causing the towpath to be on the side of the canal channel,
resulting in it frequently being very muddy and with a steep climb up to Station Road (as noted above, the towpath did not pass under this bridge as here
it changed from the south side of the canal to the north side). In early 2013 SSE drastically reduced the hedge that bordered their compound,
so the Branch decided that it would take this opportunity to move the towpath up to the level of the sub-station fence. This required the removal of the
remaining hedge stumps and raising the ground level adjacent to Station Road and alongside the sub-station with many tons of subsoil.
Finally the path was topped with stone and completed in 2018.
This length holds water during the winter & spring but is heavily reeded.

The Branch maintains the towpath which it is much used by the public and is part of the Shrivenham Circular Walk. 
At Stainwick Lane,
originially there was a lift bridge but the canal is now infilled.

 Towpath by sub-station  Looking westwards from Stainswick Lane

 

 Stainswick Lane to Tuckmill Brook (710m) - Adjacent to Stainswick Lane is the Shrivenham Canal Park, an active project and open to the public.
The towpath to Tuckmill Brook is maintained by the Branch and again is in frequent use. Apart from the section of canal within the Park and a 100m length
adjacent to Savernake Brake, the canal channel has not been dredged but is clearly visible.
The aqueduct that carried the canal over the brook has long since been demolished but the Branch plans to instal a footbridge when time and funds permit.

This section only has water after heavy rain but this has enabled the Branch, with the help of many volunteer groups, to keep the canal channel clear of scrub
during drier months.

 Looking westwards across the Park after winter rains  The Canal Park
   Towards Tuckmill Brook (2019)

At Savernake Brake

 The site of the aqueduct over Tuckmill Brook

     
     

 

 

 

 

 

 

 

 

 

PayPal Donation with Gift Aid

I want to Gift Aid this donation to the Wilts & Berks Canal Trust. I am a UK taxpayer and understand that if I pay less Income Tax and/or Capital Gains Tax than the amount of Gift Aid claimed on all my donations in that tax year it is my responsibility to pay any difference.

Proceed to donate with Gift Aid using